Free home visit · Fixed pricing · 45-day delivery · 5-year warrantyBook now →
8 min read · 5 May 2025

Home Renovation Cost in Jaipur 2025: Room-by-Room Guide

Planning a home renovation in Jaipur? A room-by-room cost guide covering kitchen, bathroom, bedroom, and full home renovation budgets for 2025.

Home renovation in Jaipur is booming — older homes from the 2000s are being updated to modern standards, and new possession flats are being fitted from scratch. Here's what renovation costs in 2025.

What is "Home Renovation"?

Renovation typically means upgrading an existing, occupied home rather than fitting out a new flat from scratch. It can include:

  • Replacing the kitchen
  • Upgrading bathrooms
  • New flooring
  • Fresh paint
  • New wardrobes
  • False ceiling upgrade
  • Electrical rewiring

Kitchen Renovation Cost in Jaipur

ScopeCost
|-------|------|

Shutter replacement only₹35K–₹60K
Full modular replacement₹80K–₹2L
Kitchen + tiling + plumbing₹1.5L–₹3.5L

Bathroom Renovation Cost in Jaipur

ScopeCost per bathroom
|-------|-----------------|

Tile replacement only₹25K–₹50K
Fitting upgrade (sanitaryware)₹20K–₹45K
Full bathroom renovation₹50K–₹1.5L

Full bathroom renovation includes: wall and floor tiles, waterproofing, new sanitaryware (WC, basin, shower), new fittings, electrical.

Flooring Renovation Cost

TypeCost (supply + fitting)
|------|------------------------|

Vitrified tiles (remove old + new)₹55–100/sq ft
Wooden flooring (engineered)₹90–180/sq ft
Epoxy flooring₹60–100/sq ft

For a 1,000 sq ft flat: floor renovation costs ₹55K–₹1.8L depending on material.

False Ceiling Renovation

Adding false ceiling to an existing home: ₹55–110/sq ft depending on material (same as new installation — there's no "existing" to work with).

Complete Home Renovation Costs

Flat SizeLight Renovation (paint + minor upgrades)Full Renovation
|-----------|------------------------------------------|-----------------|

1 BHK₹2L–₹4L₹5L–₹10L
2 BHK₹4L–₹7L₹8L–₹16L
3 BHK₹6L–₹12L₹14L–₹25L

How Long Does a Renovation Take?

ScopeTimeline
|-------|----------|

Kitchen only10–15 days
Bathroom(s) only7–14 days per bathroom
Full home renovation45–75 days

Can You Live at Home During Renovation?

For kitchen and bedroom work only — yes, with some inconvenience.

For full home renovation including flooring and bathrooms — most clients temporarily vacate for 2–4 weeks during the intensive civil phase.

Tips for Managing Renovation Cost

1. Prioritise high-impact rooms: Kitchen and master bedroom have the highest return on renovation investment.

2. Fix the budget before you start: Renovations have a tendency to expand. Set a budget and get a fixed-price quote before signing.

3. Don't mix contractors: Using one contractor for kitchen, another for paint, and a third for flooring creates gaps and disputes. A single contractor is more accountable.

At Amazing Homes, we handle full home renovation under a single fixed-price contract. Book a free consultation →

Ready to Start Your Home?

Free home visit, 3D design, and itemised quote — no charges, no obligation.

Book Free Consultation